← ReGear Journal

News

New Punakaiki walkways complete the Dolomite Point project

ReGear

Two walkways completed Punakaiki’s Dolomite Point project in January 2026. DOC no longer lists the temporary closure that ran through 22 October.
View from the new Punakaiki lookout across Dolomite Point towards the sea.

Updated 24 October 2026: Rechecked access after the temporary closure’s listed end date; DOC’s walkway page no longer displays that alert.

Access after the October works notice

The earlier construction notice listed Te Korowai o Punangairi Walkway and the southern car park as closed through 22 October. On 24 October, DOC’s current walkway page no longer lists that closure and describes access from the southern car park. Check the current DOC page and on-site signs before setting out.

Two walkways completed in January 2026 brought the Dolomite Point redevelopment at Punakaiki to its final stage, DOC reported on 26 January.

A forest walk above the coast

Te Korowai o Punangairi Walkway passes through nīkau forest and limestone features to a lookout above the coast. Its entrance is in the southern car park at Dolomite Point.

A separate southern village connection gives pedestrians an alternative to walking beside State Highway 6. These additions sit within the wider network developed around the visitor area.

Keep to the formed path

The lookout walk includes steps. DOC also highlights the limestone karst terrain: sinkholes can be hidden by vegetation beside the track, so keep to the path and supervise children.

ReGear’s take

The new links give a stop at Punakaiki more scope than a single viewpoint. They are worth knowing about when planning a coastal visit, especially if older maps or itineraries omit them.

Sources and image credits

DOC’s dated announcement; current DOC visitor information, checked 21 October 2026. ReGear’s take is editorial opinion.

Photograph: DOC, CC BY 4.0, supplied with the announcement.